Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Almeida, L, Tam, V W, Le, K N and She, Y (2020) Effects of occupant behaviour on energy performance in buildings: a green and non-green building comparison. Engineering, Construction and Architectural Management, 27(08), 1939–62.

Hu, W, Dong, J, Hwang, B, Ren, R and Chen, Z (2020) Network planning of urban underground logistics system with hub-and-spoke layout: two phase cluster-based approach. Engineering, Construction and Architectural Management, 27(08), 2079–105.

Jeelani, I, Han, K and Albert, A (2020) Development of virtual reality and stereo-panoramic environments for construction safety training. Engineering, Construction and Architectural Management, 27(08), 1853–76.

Ji, Y, Qi, K, Qi, Y, Li, Y, Li, H X, Lei, Z and Liu, Y (2020) BIM-based life-cycle environmental assessment of prefabricated buildings. Engineering, Construction and Architectural Management, 27(08), 1703–25.

Li, H X, Ma, Z, Liu, H, Wang, J, Al-Hussein, M and Mills, A (2020) Exploring and verifying BIM-based energy simulation for building operations. Engineering, Construction and Architectural Management, 27(08), 1679–702.

Li, Q, Sun, Q, Tao, S and Gao, X (2019) Multi-skill project scheduling with skill evolution and cooperation effectiveness. Engineering, Construction and Architectural Management, 27(08), 2023–45.

Li, X, Li, J, Zhang, X, Gao, J and Zhang, C (2020) Simplified analysis of cable-stayed bridges with longitudinal viscous dampers. Engineering, Construction and Architectural Management, 27(08), 1993–2022.

Lu, H, Qi, J, Li, J, Xie, Y, Xu, G and Wang, H (2020) Multi-agent based safety computational experiment system for shield tunneling projects. Engineering, Construction and Architectural Management, 27(08), 1963–91.

  • Type: Journal Article
  • Keywords: Shield tunneling project; Safety performance; Computational experiments; Multi-agent technology;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-12-2019-0726
  • Abstract:
    In shield tunneling projects, human, shield machine and underground environment are tightly coupled and interacted. Accidents often occur under dysfunctional interactions among them. Therefore, this paper aims to develop a multi-agent based safety computational experiment system (SCES) and use it to identify the main influential factors of various aspects of human, shield machine and underground environment.Design/methodology/approach The methods mainly comprised computational experiments and multi-agent technologies. First, a safety model with human-machine-environment interaction consideration is developed through the multi-agent technologies. On this basis, SCES is implemented. Then computational experiments are designed and performed on SCES for analyzing safety performance and identifying the main influential factors.Findings The main influential factors of two common accidents are identified. For surface settlement, the main influential factors are ranked as experience, soil density, soil cohesion, screw conveyor speed and thrust force in descending order of influence levels; for mud cake on cutter, they are ranked as soil cohesion, experience, cutter speed and screw conveyor speed. These results are consistent with intuition and previous studies and demonstrate the applicability of SCES.Practical implications The proposed SCES provides comprehensive risk factor identification for shield tunneling projects and also insights to support informed decisions for safety management.Originality/value A safety model with human-machine-environment interaction consideration is developed and computational experiments are used to analyze the safety performance. The novel method and model could contribute to system-based safety research and promote systematic understanding of the safety performance of shield tunneling projects.

Meng, Q, Zhang, Y, Li, Z, Shi, W, Wang, J, Sun, Y, Xu, L and Wang, X (2020) A review of integrated applications of BIM and related technologies in whole building life cycle. Engineering, Construction and Architectural Management, 27(08), 1647–77.

Stride, M, Hon, C K, Liu, R and Xia, B (2020) The use of building information modelling by quantity surveyors in facilities management roles. Engineering, Construction and Architectural Management, 27(08), 1795–812.

Tang, L, Griffith, L, Stevens, M and Hardie, M (2020) Social media analytics in the construction industry comparison study between China and the United States. Engineering, Construction and Architectural Management, 27(08), 1877–89.

Wu, H, Shen, G, Lin, X, Li, M, Zhang, B and Li, C Z (2020) Screening patents of ICT in construction using deep learning and NLP techniques. Engineering, Construction and Architectural Management, 27(08), 1891–912.

Xie, X, Lu, Q, Rodenas-Herraiz, D, Parlikad, A K and Schooling, J M (2020) Visualised inspection system for monitoring environmental anomalies during daily operation and maintenance. Engineering, Construction and Architectural Management, 27(08), 1835–52.

Xu, M, Mei, Z, Luo, S and Tan, Y (2020) Optimization algorithms for construction site layout planning: a systematic literature review. Engineering, Construction and Architectural Management, 27(08), 1913–38.

Xu, W and Wang, T (2020) Dynamic safety prewarning mechanism of human–machine–environment using computer vision. Engineering, Construction and Architectural Management, 27(08), 1813–33.

Xu, Z, Wang, X, Xiao, Y and Yuan, J (2020) Modeling and performance evaluation of PPP projects utilizing IFC extension and enhanced matter-element method. Engineering, Construction and Architectural Management, 27(08), 1763–94.

Yuan, J, Li, X, Ke, Y, Xu, W and Xu, Z (2020) Developing a building information modeling–based performance management system for public–private partnerships. Engineering, Construction and Architectural Management, 27(08), 1727–62.

Zhang, J, Ouyang, Y, Li, H, Ballesteros-Pérez, P and Skitmore, M (2020) Simulation analysis of incentives on employees' acceptance of foreign joint venture management practices: a case study. Engineering, Construction and Architectural Management, 27(08), 2047–78.